Trung Son Hydropower Company (TSHPCo)
Procurement and Construction Supervision Disclosure Standards
INTRODUCTION
In proposing these standards for THSPCo’s consideration, consideration has been given to the disclosure requirements, prohibitions and/or recommendations of the following documents:
· Bidding Law, 2005
· Anti-Corruption Law, 2005
· MPI Disclosure Standards as recommended in the Aligned Monitoring Tool (the implementation status of which is not known)
· The preliminary results of the 2010 Vietnam pilot for the Construction Sector Transparency Initiative (CoST)
· World Bank Guidelines on Procurement under IBRD Loans and IDA Credits, 2004
· World Bank Guidelines on Selection and Employment of Consultants by World Bank Borrowers, 2004
SUGGESTED THSPCo DISCLOSURE
Two levels:
– Individual Bid Package transaction histories
– Quarterly Summary reporting (with Annual Consolidation) derived from the individual transaction histories
Read more:Download here